My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE105229
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE105229
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:58:15 PM
Creation date
11/24/2007 12:04:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1989029
IBM Index Class Name
Permit File
Doc Name
APPLICATION FOR A MINING SPECIAL PERMIT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />1 <br />Disturbance <br />following: <br />LJ <br />1 <br />1 <br />t <br /> <br />1 <br /> <br /> <br />1 <br /> <br />1 <br />1 <br /> <br /> <br /> <br />associated with <br />Ma or Disturbance <br />Mlining <br />:tripped <br />Topsoil Stockpiles <br />Moderate Disturbance <br />F~lant site <br />Office and Scale House <br />Minor Disturbance <br />A.eclaimed and Seeded <br />F.eseeding Year 2 <br />TOTAL DISTURBED ACREAGE <br />8.0 <br />3.0 <br />1.0 <br />12.0 <br />0.5 <br />2.0 <br />0.5 <br />97:0 <br />The mining phases shown on Exhibit C represent estimates for <br />mineral extraction in one year increments. The Wining plan calls <br />for completion in approximately 10 years. Mining and reclamation <br />of each phase will be done contemporaneously. When mining is <br />completed in one phase and moves to the next phase, reclamation <br />activities will begin immediately on the completed phase. <br />Grading and backsloping of shorelines will be done using <br />stockpiled topsoil and overburden. Reseeding will be done in <br />early spring or late fall depending on the progress of regrading. <br />Provisions have been made to return the following year and reseed <br />areas where previous reclamation was not successful. The <br />estimated time between completion of a mining phase and <br />accomplishing final reclamation is two years. <br />Equipment used for mining will be: <br />Scraper and 988 front end loader for stripping <br />980 front end loader for mining <br />Portable conveyor system <br />Twin dewatering screw <br />Processing Equipment: <br />Three deck bay screen <br />4-1/4 foot cone crusher <br />Three screen wet deck <br />Nine cell sand classifier <br />Haul vehicles will consist of a fleet of twelve 25 ton end dumps. <br />mining is classified as the <br />' D-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.