Laserfiche WebLink
<br />EXHIBIT E <br />RECLAMATION PLAN <br /> <br />The area to be reclaimed will be final graded, topsoil restored and seeded in phases as indicated on the <br />"Mining Plan Map" Exhibits C &D. Eventually the result H~II be an area basically Flat with a maximum <br />slope of 2% sloping from the northeast toward the southwest. <br />At the boundary' areas the transition slopes to have a maxtntum slope of 3: I vvtth 3: I preferred where <br />possible. Slopes t;~ll transition into the natural grades. See Exhibit f for the "Reclamation Plan Map". <br />