Laserfiche WebLink
<br /> <br />2. County P.oads to ]~e used by this operation shall he <br />~o elect<~natc ~'. b}~ llic Cnunl.y ):~,y.inr•cr ,f.t~~r ~:w~su]tai ion w i h ; lir <br />anp].icaut and shall be hard-surfaced at the applicant's!er.penr.e <br />to the specific~.tion ant approval by the County T'nyineer. <br />3. 1~ hydrological study will be done by a qualified <br />hydrological enrlinecr to determine. that no adverse impacts to the <br />domzstic tend agricultural water ~aelIs in tlic area will result <br />from this operation. The e>:act area of the potential impacts <br />shall be determined by such engineer. The applicant shall meet <br />all spr-_cifications of the engineer to eliminate any adverse <br />impacts if such are found to exist. <br />4. The hydrological study and road improvement plan <br />shall be completed within 90 days from the date hereof. <br />5. If the property is not developed and used as a <br />sand and gravel er.traction pit consistent with the terms and <br />conditions hereof within two years of the date hereof, this <br />approval shall become null and void and of no further force and <br />effect. <br />Exhibit "A", attached hereto and incorporated <br />herein by this reference. <br />Commissioners tiotchkiss and Tha}per voted in favor of <br />the Findings and Resolution and Commissioner Weitzel voted against <br />the same. The Findings and Resolution were duly adopted. <br />DATED this -F~- day Of ~f=r~<,~%~Lrl 19 , <br />`7`- <br />as of. November 2R, 1979. <br />THE BOARD Oi COUNTY COI/iMISSIONERS <br />OF THE COUNTY OF T,ARIt3ER <br />i <br />Chairman <br />(SEAL) <br />A'i'TE T: <br />Deputy-and Acting Clerk <br />of Bard Boatd <br /> <br /> <br />-4- <br />