My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE105065
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE105065
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:58:08 PM
Creation date
11/24/2007 11:51:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981158
IBM Index Class Name
Permit File
Doc Date
11/18/1981
Doc Name
FOREST LAKES SAND & GRAVEL PERMIT APPLICATION
From
SOUTHWEST PROPERTIES INC
To
MLRB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.. <br /> <br /> <br />S 0 U l H L !/F5I p l 9 0 P FR I/FS, i n c. <br />'i to your departments recomendations. No <br />A culvert and head gate will be in- <br />si:alled to provide water flow between <br />tkte two sides of the pit along with a <br />cktlorine contact chamber. <br />3. <br />Tkie floor of pit #2 will not be reworked, ~~ <br />e~:cept for previously mentioned con- <br />touring, as the area will be covered with <br />water. <br />Exhibit H - Reclamation Costs (revised) <br />Because reclame~tion of the old pit (pit #2) is being <br />included in this ple~n, revised cost estimates are given below. <br />1. Pit #1 <br />a) 10 hours of dozer time at $45.00 per hour y S ~ <br />b) four houf~S of front end loader time to ~ ~ ,, <br />replace top soil along pond edge at <br />$45.00 per hour. <br />c) four hours of grader time to spread top 2 s ~• <br />soil and bring area to final grade at <br />$55.00 per hour. <br />d) seeding costs allowance of $1000.00 ~,~.~ <br />i <br />2. Pit #2 <br />a) Backsloping of pit edges requiring 20 ~~ ~ ~~ <br />hours of D7 dozer time at $65.00 per ~ <br />hour. <br />b) 30 hours of truck and loader time to ~ <br />place stockpiled top soil on sloped edges ~`~2 ~ <br />at $75 per hour for both pieces of equip- <br />ment. <br />c) Construction of berm <br />stabalized slopes to <br />Forest Lakes 6letropo <br />part of their sewage <br />d) Sending allowance of <br />and roadway with <br />be provided by <br />Litan District as <br />treatment facilities plan. <br />$3000.00 for this pit. ~o~-~ <br />~~,-y~ - <br />1005 West Southern Avenue / Mesa, Arizona 85202 /Telephone (602) 969-8000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.