Laserfiche WebLink
TABLE 1 <br />~• DATE ACTIVITY <br />2/24/81 First fault encountered. Water flow from 2L <br />entry ti 110 gpm. <br />3/81 - 5/81 Section that encountered fault drives 2W - 1L <br />panel on the eastern side of the fault toward <br />the south. R.Marrs contracted to perform <br />photogeologic interpretation. <br />5/28/81 First fault re-encountered in 1R entry of <br />2W - 1L. entry. <br />5/81 - 1/82 Pillars pulled in 2W - 1L entry. Centennial <br />Construction contracted to tunnel through first <br />fault in 1L, belt, 1R entries 2W mains. Field <br />studies using VLF (E-M) surveys and surface <br />mapping conducted. <br />1/82 - 2/18/82 Section operates on west side of first fault <br />encounters second fault on 2/18/82. While <br />operating in this area, water flow to the area <br />estimated as high as 448 gpm. <br />• 3/82 J&L Drilling Co. contracted to drill three core <br />holes from Eagle No. 5 Mine to determine <br />stratigraphy in 2W area between faults. Conduct <br />underground mapping of significant geologic, <br />structural, and hydrogeologic features. Section <br />crosses second fault and operates to west of <br />second fault. <br />3/25/82 Preliminary findings of investigation published. <br />Drilling continues. <br />4/15/82 Drilling underground complete. <br />4/82 - 5/4/82 Mining continues west of eecond fault. Amoco <br />Minerals staff consulted for assistance in <br />determining source of water in 2 West. <br />6/4/82 Third fault encountered. water flows between <br />first and second fault measured at 260 gpm. <br /> <br />