My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE104909
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE104909
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:58:01 PM
Creation date
11/24/2007 11:42:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Permit File
Doc Date
1/13/1989
Doc Name
SAN LUIS PROJECT ADEQACY CONCERNS FILE M-88-112
From
MLRD
To
BATTLE MTN RESOURCES
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />EXHIBIT B - INDEX MAP <br /> <br />V 2. The Index Map should show the regional location of the affected land and <br />all roads and other access to the area. A standard U.S. Geological <br />Survey topographic quadrangle or equivalent is acceptable. Please provide <br />a map conforming to 2.1,2(31 of the Regulations. <br />EXHIBIT D - F1INE PLAN <br />Section D 2.1 General <br />J 3. Please specify what excavation, loading, and material transport equipment <br />will be utilized both for ore/waste and soil/subsoil removal. <br />Section D.2.3 Site Description <br />4. As the West pit mining operation will require county road relocation, <br />please provide documentation verifying that the County has au :horized <br />this relocation. <br />Section D.2.5 Pit Wall Stability <br />5. The pit wall stability study should be conducted to determine the slope <br />at which the pitwalls would be stable, assuming that ongoing cewatering <br />would cease following termination of mining. As the slope stability <br />analysis may influence the postmining pit configuration, the results of <br />the analysis should be submitted prior to permit approval. <br />Section D.3 Waste Rock Disposal <br />Section D.3.1 General <br />6. Does cross section A-A', illustrated in Figure D.3-4, refer tc a specific <br />figure, or is this an idealized cross section? <br />Section D.3.3.2 Waste Rock Geochemistry <br />7. Please specify the location and depth of each waste rock sample taken, <br />This information will help us to make a determination as to the sample <br />significance. <br />-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.