Laserfiche WebLink
EXHIBIT 3 <br />• FUTURE ASH BASED UPON DRILL HOLE DATA <br /> <br /> Drill Hole Coal Height Mining Height <br /> 4 10.6' <br /> 12-1-78 8' <br /> 3 10.16' <br /> 5 years 8' <br /> 2 5.5 <br /> 12-1-80 6.0 <br /> 6.5 <br />• <br />1 7' <br />Mining Presently <br />Mine Run Ash now runs 12% to 15% <br />Attempting to Mine 5.5' to 6' coal with only 3% Ash <br />8' <br />• <br />Rock Estimated <br />Partings % Ash <br />1.9' 18% <br />1.9' 24% <br />1.75' 17% <br />1.17' 14% <br />clean +3% <br />.5 8% <br />1.0 15% <br />clean +3% <br />1' 12.5% <br />-9- <br />