Laserfiche WebLink
<br />• <br />SECTION 3.02.2 <br />DETERMINATION OF BOND AMOUNT <br />The amount of performance bond was jointly calculated by Erik Crosby from the Colorado Division <br />of Minerals and Geology and Ross Gubka from Western Fuels-Colorado. <br />A summary of the cost for New Horizon 1 and New Horizon 2 Mine can be seen in TABLE 3.02.2- <br />1. The actual work sheets can be examined in Attachment 3.02.2-1 and 2. <br />• (REVISED JAN-26-01) 3.02.2-1 <br />