My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE104609
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE104609
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:57:47 PM
Creation date
11/24/2007 11:21:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984036
IBM Index Class Name
Permit File
Doc Date
12/6/1996
Doc Name
DECREASE IN REQUIRED FINANCIAL WARRANTY FOR DAKOLIOS PIT PN M-84-036
From
DMG
To
VARRA CO INC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />~I <br />ROADABLE EWIPMENT: ~~, sheet 2 of 2 <br />Total Eop. Fleet Size Xaul Trip R turn Trfp <br />Mschlre Description ~. Costfhr (ro. hauled) Cost/hr Cost/hr <br />= C C C L 3 3 C <br />MOB/DEMOB SUPPORT EQUIPMENT: <br />Yeight Ownership Haul Rip <br />Mon-Roadeble Ems. Description (tore) Cost/hr Cost/hr <br />Subtotals : 50.00 <br />Fleet Size Haul Trip <br />(no. hauled) Cost/hr <br />Roadeble Eop. Description) <br />Subtotals f0.00 f0.00 <br />Total Eqp. Fleet Size Xaul Trip Re urn Trip <br />Cost/hr (ro. hauled) Lost/hr ost/hr <br />Subtotals f0.00 <br />50.00 <br />n Trip DOT Permit <br />t/hr Cost/ea <br />f0.00 <br />f0,00 <br />EQUIPMENT XAUL DISTANCE d~TIME <br />Nearest major city or ),town within project area region: LorgANlnt <br />Total are way travel dis[grce 5.0 miles. Average travel speed = <br />Jab Tine - Mon Roadeble Equip.= 0.50 hours load Roadable Equip.= <br />i 0.17 hours haul <br />~ 0.50 hours unload <br />0.17 hours return <br />30.00 mph. <br />N/A hours l <br />0.77 hours h ul <br />N/A hours load <br />0.77 hours r turn <br />JOB COST Total Mob/Demob Cost = f1,997.58 <br />NOTE: Man-roadable equipment (haul rig required to transporU mob/demob costs based an 2 round trips, each trip <br />taro istirg of a ore~wey loaded haul and a one-way eapty return. Roadable equi picot (no eul rig required) <br />costs based on one ~ourd trip. Colorado DOT requires special permits for oversize etlui t an certain <br />specified road s is within the State. Separate permits ere required for each rig on each loaded trip. <br />Additiorelly, pilot cars (are or two per rig depending on degree of oversize) are also r fired for oversize <br />equipment hauling, end loedi ng/unloading times must be increased substantially for equi t which Host be <br />. perti ally dismantled for trareport end re-esseabled at the job site. Costs for lifting ipment and other <br />support equi pment iteedod for this work should be included in the sob/demob costs. <br />it <br />
The URL can be used to link to this page
Your browser does not support the video tag.