Laserfiche WebLink
• <br />Colorado Division of Minerals end Geology <br />' ESTIMATING FORM - EOUIPMEMi MOB IL 17J1T IOM /DEMOBILIZATION <br />~ G ~__ L = __ ==C C = = C= <br />Tack /... 5 Prep. b'/ CLK Filerwre..N036-5 <br />_ ~_..r _ <br />Date..... 04-Dec-% Permit 1' M-84-036 Mi re......Dekolios Pit <br />Penait Actl en........ Recalculation of Bond <br />Task Description..... Mllob/Demob Equipment to the site ~____ YV <br />HOURLY EW IPMENT COST <br />sheet 1 of 2 <br />___________:________= NOTE - This is a list to celect fans, not a list of mandatory terra to include. <br />Mab/Deanb Eqp. -Treetor i 6x4, 75,000 lb GW, 375 XP, diesel powered <br /> -Lt. Treli ler 25 ton folding gooseneck, drop deck <br /> -Med. Trailer : <br />~ 50 ton folding gooseneck, drop deck <br /> -XVy. Tre <br />'ler ; 120 Ton folding gooseneck, drop deck <br /> -Pilot Caf : On-highway light duty truck, 4x2, 130 hp, 1/2 ton rating, gaso iro powered <br /> -Xyd. Crane Grove RT58D rough terrain hydraulic crane, 20 ton capacity, 12 hp, 60 f[. boon <br /> -Fuel Truck : 6x4, 3,600 gallon capacity, 210 NP, diesel powered <br /> -Cube Truk : 6x4, 2,500 gallon capacity, 210 HP, diesel powered <br /> -Flatbed Truck: 20,000 lb GW, 175 HP, diesel powered <br />d __M <br />____- <br />, <br />Last Up <br />ate: _ _ _____~_~_ __~ <br />_ <br />Decenfxr, 1994 i <br /> LtJ Rig Med.Rig Hvy.Rig Pilot Xydraulic Fuel lobe Flatbed <br />Cost Breakdown: <=25 T. 26-50 T. > 50 T. Car Crane Truck Truck Truck <br />-_-Ownership Cost/hr = <br />Operetirp Cost/hr <br />Operator Cost/hr = <br />Helper Cost/hr = <br />Total = <br />Npl-ROADABLE EgII PMENT: <br />Machire Description <br /> <br />.88 131.23 538.36 21.81 519.89 fb,95 412.79 55.71 <br />.84 f29.29 f34.27 f5.12 f23.40 518,53 424.52 48.00 <br />.40 f22.03 (22.03 f21.24 (20.86 421.24 521.24 521.24 <br />.60 121.24 f21.24 f0.00 f0,00 40,00 40.00 f0.00 <br />.72 4103.79 f115.90 428.17 f64. 15 446. T2 458.55 f34.95 <br /> weight Ownership Haul Rig Fleet Size Haul Trip Re urn Trip DOT Permit <br /> (tons) Cost/hr Costlhr (no. hauled) Cost/hr ost/hr Cost/ea <br />------------- ---- ---- --------------------- --- <br />Cat 637E w/BOPS cab 30.00 467.47 5103.79 2 4342.52 <br />GT D8N w/ripper 45.00 f53.08 f103.79 2 f313.74 <br />Reveg. equipment 15.00 f30.00 f%.72 1 f126.72 <br />Subtotals 5782.98 <br />.58 <br />.58 <br />s%.7z <br />.sa so.oo <br />