5. Please indicate the measures that will be taken to ensure the waste rock disposal <br />area will not exceed background radiation levels after the site is reclaimed. <br />Include current background radiation levels for this location. <br />6. Please provide specifications of the proposed portal closure. DMG recommends <br />installation of a bulkhead 25 feet in the portal and then an earthen backfill of the <br />adit out from the bulkhead. Alternatively, if the mine workings are demonstrated <br />Yo be favored as a hibernaculum for bats, Rimrock may wish to consider <br />installation of a bat grate closure. <br />7. Please provide detailed specifications for the vent closure design and process. <br />8. Please clarify whether 3:1 slopes from waste rock deposits will be maintained <br />through out the duration of mining or established after mining is complete prior to <br />re-soiling. <br />9. Please indicate at what intervals seeding for erosion control of topsoil stockpiles <br />will be accomplished. Also, DMG recommends using the approved seed mix for <br />topsoil stabilization. Will Rimrock use the BLM mix or something else? <br />10. The Reclamation Plan notes that USDA methods and mix will be used. However, <br />BLM has a different mix. Please clarify which will be used. <br />11. Please submit a Noxious Weed Control Plan approved by the Montrose County <br />Weed Control Manager. Knapweed in particulaz was observed near the proposed <br />site. <br />12. DMG will require SPLP testing of waste rock and ore generated from mining <br />activities. Please commit to notifying DMG staff in writing of deposition of these <br />materials on the surface within 30 days of actually doing so. When the Division <br />receives the notice, exact testing parameters will be discussed in detail for the <br />SPLP testing. Testing must be done by a state certified laboratory and Rimrock <br />must submit a copy of the final results to the Division within 30 days of receipt. <br />Please note that the results of the testing will be used to determine whether <br />additional review for Designated Mining Operation status is warranted. <br />13. The Division has not received documentation from Rimrock that the Bureau of <br />Land Management is cuaently reviewing the application. Please be awaze that <br />although the Division may approve the permit, BLM's process must also be <br />complete prior any disturbance. Many issues can be addressed simultaneously <br />and reduce Rimrock's application review times. <br />