My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE104493
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE104493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:57:42 PM
Creation date
11/24/2007 11:14:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004078
IBM Index Class Name
Permit File
Doc Date
3/8/2005
Doc Name
Lupton Lakes Stability Analysis
From
DMG
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Lupton Lakes Resource M-2004-078 <br />In the Civil Resources letter it states that, "...the aggregate will likely be transported via <br />conveyor to a processing plant located west of Highway 85 on the existing Lafarge property." <br />The conveyor is not included in the mine plan or exhibits. Please clarify and revise the permit <br />and maps accordingly. <br />2. The Civil Resources report notes a number of borings and piezometers located on the <br />property. Please be aware that the applicant must file for a Notice of Intent to Conduct <br />Exploration Operations prior to the commencement of such activity. Please see Rule 5 for <br />further detail. <br />3. Please be aware if the applicant encroaches into any easements as a result of the mining and <br />operation plan, then the applicant must obtain legal right of entry document from the easement <br />holder. Please state what easements will be included, and provide legal right of entry <br />agreements. <br />4. Please inform the Division as to the recorded easement distance for Highway 85, and locate <br />such easement on the exhibits. <br />5. On the Villano property, there is a 50-foot gas line easement running due north of the well. <br />There does not appear to be an offset from the temporary 4' high berm and the boundary of <br />the easement. Please clarify. <br />6. The existing well on the Adams property has a 50-foot easement along Highway 85. This <br />easement is not located on the exhibits and does not appear that there is a buffer from this <br />easement. Please clarify. <br />The applicant assumes a 35-foot easement from the Fulton ditch centerline, or 15 feet from <br />the top of the bank, whichever is greater. Please give an accurate easement location, rather <br />than assume 35 feet from the ditch centerline. <br />
The URL can be used to link to this page
Your browser does not support the video tag.