Laserfiche WebLink
<br />STIPUTATION N0, 3 <br /> <br />Stabilization And Reclamation Of The Tailings Pond <br />This plan can be extended only for a few years. The exact elevation <br />and configuration of the tailings pond at shut down cannot be determined. <br />Ef reclamation of the pond is necessary within the next five years <br />Federal Resources will make every effort to stabilize and revegatate <br />the tailings pond. To keep the pond in a stabile condition it may not <br />be permissable to grade certain steep slopes. Small terraces will be <br />cut in these areas. Topsoil of an amount determined by what is avail- <br />able will be placed in these areas and seeded. Areas which can be <br />graded will be graded to an angle of repose as low as possible. These <br />areas will then be covered with topsoil (if available) and seeded, <br />The top of the pond will be covered with topsoil (if available) and <br />seeded, Rip rap material will be placed at the tce of the dam and <br />other areas of apparent erosion, depending on the final configuration <br />of the pond, <br />