Laserfiche WebLink
Facilities <br />• There have been a number of changes to the existing facilities. Permit Renewal <br />Maps 4 aryl 5, Mine Plan, Roads, Power Lines and Facilities, show the locations <br />for existing structures except for sedimentation ponds which are found on Permit <br />Renewal Maps 9A Hydrologic Features/~~mP*+t Control and l0A Hydrologic Features. <br />Tipple No. 1 Facility has been removed. The remaining structures can be <br />classified as follows: <br />Shop and Warehouse Conq~lex <br />~,;pment Construction Site <br />Tipple No. 2 Facility <br />Fycplasives Bunker <br />Sedimentation Ponds <br />Haul Roads <br />(includes light duty bay) <br />Mine Office Complex <br />Tipple No. 1 Facility <br />Railroad <br />Powerlines <br />Water Supply Line <br />Of the above facilities, the following remain in the CYCC permit: <br />Shop Operation Office <br />S~~mP*+tation Ponds; as noted <br />The remainder of the above listed facilities have been transferred to TWentymile <br />Coal Company. T+OC will be responsible for the reclamation of the facilities <br />after they are no longer needed for its operation. <br />• Shop & Warehouse Complex <br />Changes to the buildings in this area include an addition to the warehouse for <br />storage of parts, a tine shop and replacement of the shop-office trailer with a <br />maintenance and production office. All of the above are shown on Permit Renewal <br />Maps 4 and 5, Mine Plan, Roads, Power Lines aryl Facilities. CYCC will continue <br />to use the shop facility until reclamation activities are ocmq~leted in the fall, <br />1991. The remainder of the shop and warehouse c~nq~lex, excluding the shop, has <br />been transferred to Twentymile Coal Conpany. The light duty shop which is part <br />of the shop and warehouse complex, will be transferred to TWentymile Coal <br />Companuy. Given the proximity of the shop and warehouse, CYCC will continue to ~ <br />use the road system surxrnu~ding the area, although TCC will have reclamation and \J <br />permi~ responsibilities for the roads. ~----_ ._ .__._.~ l <br />Preventive Maintenance Bav (P.M.Ba <br />This area was formerly the equipment wnstruction site. It is now used to <br />service equipment and for storage of miscellaneous material. Changes to the P.M. <br />Bay included the addition of a large equipment wash bay and anelectrical/bulk <br />ANFO supply shop. The electrical/bulk ANFO shop contains associated supplies, <br />an office and an area for parking trucks. <br /> <br />TR 91-30 Permit Renewal 780-30-1 Revised 06/14/91 <br />