Laserfiche WebLink
<br /> <br /> <br />ESTIMATION OF RECLAMATIOPI COSTS (Continued) <br />Topsoil Replacement: <br />Assumption <br />1. 2700 CY of topsoil to replace <br />2. Average push 200' <br />3. Use a D-7 <br />Production of D7: <br />Unadjusted - 300 CY/hr <br />Adjustment Factors <br />Operator - .75 <br />Material - .80 <br />Job Eff. -'.83 <br />Production = 300 CY/hr X .75 X .80 X .83 <br />= 149 CY/hr <br />2700 CY 18.1 hrs <br />149 CY/hr <br />$170.30/hr X 18.1 hrs = $3,082 <br />Seeding <br />1 ac at $200/ac <br />lop Administrative <br />TR 89-28 <br />= 200 <br />$3,282 <br />308 <br />$3,610 <br />Say $3,600 <br />Permit Renewal 780-139-1(a) <br />P.evised 12/07/89 <br />