Laserfiche WebLink
Y ~ ESTIMATION OF RECLAMATION COSTS <br />During the midterm review and subsequent correspondence estimated <br />cost of reclamation was updated. On July 24, 1985 CMLRD approved a <br />worst case bond of $10,499,000 which amount has been submitted to <br />CMLRD. This amount did not include the maintenance bond which was to <br />be calculated and submitted following the revegetation monitoring <br />report. However, in February 17, 1986 CYCC submitted an updated <br />estimate of reclamation cost which reflected the current conditions and <br />additionally completed reclamation. The new amount of $8,126,800 also <br />covered the maintenance bond. As a result, CYCC has proposed that the <br />existing bond of $10,499,000 be maintained as it is more than adequate <br />to cover current liabilities. <br />The reclamation costs associated with the temporary access road are as <br />follows: <br /> 1) Culvert Removal - <br /> General Laborer - <br />• <br /> 2) Regrade Road - <br /> ~D-7) <br />3) Reapply Topsoil - <br />ID-7) <br />4) Reseeding <br />10~ Administration <br />4 hrs 0 515/hr. _ <br />24 hrs 0 $110.30/hr. _ <br />32 hrs (~ $170.30/hr = <br />4 acres (~ $200/acre = <br />$ 60.00 <br />$ 4,087.20 <br />$ 5,449.66 <br />$ 800.00 <br />$10,396.80 <br />5 1,040.00 <br />Say <br />$11,400.00 <br />~, <br />U <br />t•IR-89-41 <br />Permit Renewal 780-139-1 <br />- - - --" <br />Revised 08/03/89 <br /> <br />