Laserfiche WebLink
• <br />C7 <br />As indicated in the February 17, 1986 technical revision, the <br />revised mining schedule leas been based upon an anticipated <br />production rate of approximately 1.2 million tons per year. If <br />market conditions dictate, this rate may be revised accordingly. <br />It should be noted that the prime mover for the remaining life of <br />the operation will be the 8050 dragline. The mining schedule is <br />presented on the Mine Plan, Roads, Power Lines and facilities <br />(Permit Renewal Map 5), and can be summarized as follows: <br />• TR89-24 Permit Renewal 780-1-1a <br />Revised 03/01/89 <br />