Laserfiche WebLink
• <br />• <br />2. The roof bolter shall have an operating dust collec- <br />tion system, except when auger steel drilling is <br />required. <br />D. Methane Examinations <br />1. Methane examinations as required by 30 CFR shall not <br />be made from under unsupported roof. <br />E. Designated Areas <br />1. Page 90 shows a schematic drawing of the Southfield <br />Mine conveyor belt system. <br />2. Page 41 lists and locates active designated areas of <br />the Southfield Mine. <br />G. Special Plans <br />1. Breakthrough Plan <br />1. When a breakthrough is required, reasoning, <br />procedures and expectations will be formulated <br />into a plan by the Ventilation Review Committee, <br />prior to breaking through into another set of <br />mains oc submains. <br />2. Mining will be done under the direct and con- . <br />stant supervision of a certified person familiar _ <br />with this plan and the affected area of the <br />mine. <br />3. Examinations for hazardous conditions will be <br />made by the certified person prior to and after ,,, <br />the air splits are interconnected. <br />4. One working section will not break through to <br />the ventilation system of another working sec-. <br />tion. <br />5. Return entries will only be broken through t_o,_.__ _ <br />unless an--a-l~ecnate-'method--would piovide an. <br />equal degree of safety. <br />6. Ventilation controls will be in place to ensure <br />that all affected air splits will be properly <br />controlled such that no stagnant air splits or <br />air reversals occur. <br />7. Materials will be readily available to block off <br />the opening after breaking through, if required. <br /> <br />8. After the connection is completed, <br />permanent _ <br />~~`~. <br />ventilation control will be installed to proper- _ <br />~`~' <br />. <br />'~; <br />ly control the air and the mine ma p shall be. ~ <br />updated reflecting these changes. uF;: <br /> <br />2. Turnout Plan <br />1. When a turnout is required, reasoning, proce- <br />dures and expectations will be Formulated into a <br />plan by the Ventilation Review Committee, prior <br />to turnout development from a set of mains, <br />submains or panels. <br />• <br />2. Mining will be done under t}ie direct and con- <br />stant supervision of a rectified person familiar <br />with this plan and the affected area of the <br />Mine. <br />3. Examinations by the certified person will be <br />made during each phase of the turnout to ensure <br />that all affected areas are properly ventilated:=: <br />`. <br />~..~ :. <br />Page 28 _.} ~ <br />