Laserfiche WebLink
I <br />V. Miscellaneous ~'•~--~ <br />• A. Diesel Equipment ^,~ <br />1. Any diesel equipment used in or inby the last open :--~ <br />crosscut shall be approved under 30 CFR 36 and shall <br />be maintained in the approval condition. '''t_ <br />2. All diesel equipment shall be operated and maintain- ;`;•`; <br />ed in accordance with the manufacturer's operating ""• <br />.~..... <br />specifications and maintenance manual. " ±"'~• <br />3. In order to improve the working environment of min-,-.;~:"~ <br />' ers where diesel units are operating in the working. ;;~r;'_ <br />section, the quantity of ventilating air maintained.~:_~;•'.i~:' <br />in the last open crosscut shall be 100$ of the ap-:":.'i;ti <br />proval plate quantity of the largest diesel unit,-:`~~ <br />plus 758 of the approval plate quantity of the next':;<~,' <br />largest unit, plus 50$ of the approval plate quanti-~~;"~:' <br />....: <br />' ty of each additional diesel unit operating in that ":^.;;~., <br />split of air. Where diesel units, not approved ~~~';~'.;' <br />under 30 CFR 3G and those approved under 3B CFR 36.;:;`••"•; <br />..r Yy~. <br />but used outby the working section, are operating, a',~.,:.~~;_ <br />' minimum quantity of air equal to 150 cfm per rated''.ri~r <br />brake horsepower shall be maintained in the area of;,:•~:•+,~1;. <br />the unit except during a mine evacuation due to a`;',s?T~~; <br />' fan stoppage. Whenever more than one diesel unit is•;;~?~~ <br />operating on the same split of air in the same work''';~.;:}~,°; <br />area, the above air quantity requirement shall be`.~':~~;: <br />additive for each unit. '=-~'~` <br />:; ~Jk <br />;~ 9. All diesel equipment used for coal haulage, or any ~,li~i- <br />.y.: <br />other diesel equipment used in or inby the last open :;*:;~, <br />crosscut on a regular basis, shall be examined. at,';~y°~q,{) <br />least once every 29 hours to insure the equipment.is;~~~°~; <br />in proper operating condition. Other diesel equip-~,y;'~".~~,.• <br />ment, such as supply and manErip vettiicles~ shaY1~-be:%~~ <br />examined once ever seven ''~ta' <br />y (7) days to insure•the.~-;~.~„ <br />equipment is in proper operating condition. Durinq';;:r::?;, <br />these exams tl~e exhausts of each unit shall be test-:.~::'~.;'; <br />' ed to determine if the equipment is operating pro= ~~'=' <br />perly. Anytime a piece of equipment is seen to be :;~;j`i <br />emitting large amounts of black smoke on a eontinu-;;:~~, <br />' ous basis, it sha21 be removed from service and~the:;~~;~• <br />condition corrected. •:•.i <br />' A record of all diesel examinations shall be kept in ';=s+, <br />a book for that purpose, which shall include the:.;.~=•;:• <br />date, sampler's initials and the results of the..',?:~ <br />examination. The records shall be maintained for:;,;4`t~T <br />~. <br />reference purposes for at least one year. -";~•,-; <br />~ B. Examination of Seals "~•'~'~" <br />ar..'. .. :.,. <br />{ Seals that are ventilated with intake air used to vents=:,,,S:~;j~; <br />~ late active working areas shall be examined in actor-•~;.-'s;1~r'i, <br />+ dance with 30 CFR 75.303. , ,;.t ryx=k~ <br />.:.... <br />C. Roof bolting .•~~ <br />1. Where roof bolting is being done, the minimum quart- •' <br />tity of air to he maintained over the bolting mach'=..,':;'`. <br />ine shall be 3,000 cfm. Line curtain shall be main=~;''•`~ <br />tained within five (5) feet of the operator, on ;the"~~-'` <br />ventilation side of the entry. •;w,~~: ) <br />,~) <br />