Laserfiche WebLink
<br />We anticipate ores to be milled at about 608 lead, zinc <br />sulphide ores and 408 to be oxidized gold, silver, Lead <br />carbonate ores. <br />-- ~__., <br />No leaching of gold, silver ores by the cyanide process <br />is considered. <br />MILL UTILITIES <br />Electric Power <br />Electric power is furnished by Public Service Co. of <br />Colorado in sufficient quantity to serve our needs. <br />Communication <br />Communication initially for safety purposes is by <br />radio. Future plans include installation of telephone <br />service. <br />Sewage Disposal <br />Sewage disposal is proposed to be with the use of a <br />septic system located just southwest of the mill. Until <br />construction of a suitable septic system is completed, a <br />chemical toilet will be rented. The maximum number of <br />employees expected to be the mill operating crew at any one <br />time is three. <br />Water <br />Water for domestic and milling needs is furnished from <br />a properly permitted well located in the SE Quarter of <br />Section 28, Twp. 9S, Range 80W. This water and water rights <br />lease, a copy of which in included in this permit <br />application, allow for consumptive use of up ~.o six acre <br />