Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 067 <br />Date : 10/16/2006 <br />User: JRS <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Permit or other job action :Permit Renewa102 <br />Task description :Rip Freeman Gulch Vent Shaft Light-Use Road <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D9R - 9SU <br />Blade type :Semi-Universal <br />Attachment no, 1 : ROPS Cab <br />Attachment no, 2 : 3-shank ripper <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $56.94 NA <br />Dozer operating cosUhour : $104.98 100 <br />Ripper operating cost/hour : $9.97 100 <br />Operator cosUhour : $32.53 NA <br />Total unit cosUhour : $204.43 Total fleet cosUhour <br />MATERIAL QUANTITIES <br />$817.70 <br /> Selected estimating method : Area <br />Alternate methods - <br />Seismic : NA NA Load factor : NA Bank volume : NA BCY <br />Area : 0.60 acres Rip depth (ft) : 2.63 Volume : 2,546 BCY or CCY <br /> <br />Source of estimated quantity :Page 2.05-25 <br />Source of estimated load factor : NA <br />HOURLY PRODUCTION <br />Alternate methods - Job Condition Correction Factors - <br />Seismic : Seismic velocity : NA feeUsecond Unadjusted production <br />Unadjusted production : NA cu. yds./hour per selected method : 3,233.41 cu. yds./hour <br /> <br />Area : Avg. ripping depth : 2.63 feeUpass Site altitude : 7,000 feet <br />Average ripping width : 7.67 feeUpass Altitude adjustment : 1.00 (Cat HB) <br />Average ripping length : 100.00 feeUpass Job efficiency factor : O. B3 (1 shift/dayJ <br />Average dozer speed : 88.00 feeUminute Net job correction : 0.83 multiplier <br />Average maneuver time : 0.25 minutes/pass <br />Production per unit area : 0.762 acres/hour Adjusted unit production : 2,683.73 cu. yds./hour <br />Unadjusted production : 3,233.41 cu. yds./hour Adjustetl fleet production : 10,734.94 cu. yds./hour <br /> <br /> <br />JOB TIME AND COST ..: <br />,. <br />Fleet size : 4 dozers) Total job time : 0.24 hours <br />Unit cost : $0.076 per cu. yd. Total job cost : $194 <br />State :Colorado <br />County :Delta <br />Site :Bowie No. 2 Mine <br />Permitlob # : C-96-083 <br />Abbreviation :none <br />Filename : C083-067 <br />Horsepower: 405 <br />Shift basis : 1 perday <br />Data source : (CRG) <br />