Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 066 State :Colorado <br />Date : 10/13/2006 County :Delta <br />User : JRS Site :Bowie No. 2 Mine <br />Agency or organization name :Colorado Division Of Minerals And <br />Permit or otherjob action :Permit Renewal 02 <br />Task description : Regrade Access Road <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />Basic machine :Cat D9R - 9SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Ownership wsUhour <br />Operating cosUhour <br />Ripper op. cosUhour <br />Operator cosUhour <br />Total unit cosUhour <br />MATERIAL QUANTITIES <br />Initial <br />volume: 3,296 BCY <br />Permitfjob# : C-96-083 <br />Abbreviation :none <br />Filename : C083-066 <br />Horsepower: 405 <br />Utilization <br />$56.94 NA <br />$104.98 100 <br />$0.00 0 <br />$32.53 NA <br />Shift basis : 1 per day <br />Data source : (CRG) <br /> <br /> <br /> <br /> <br />$194.45 TotalfleetcosUhour <br />$777.82 <br />Swell Loose <br />factor: 1.330 volume: 4,384 LCY <br />Source of estimated volume :Division Estimate <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 100 feet <br />Unadjusted hourly production : 1,243.2 LCY/hr <br />Material consistency description <br />Compacted RII or embankment <br />Average push gradient ; 0.00 % (I <br />Average site altitude : 6,500 feet <br />Material weight : 2,900 Ibs/LCY <br />Weight description <br />Decomposed rock - 50% Rock, 50% Earth <br />JOB TIME AND COST <br />Fleet size : 4 Dozers) <br />Unit cost : $0.440 /LCY <br />Operator skill : 0.75 <br />Material consistency : 0.90 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.00 <br />Altitude : 1.00 <br />Material weight : 0.79 <br />Blade type : 1.00 <br />Net correction : 0.36 <br />Adjusted unit production : 441.76 LCY/hr <br />Adjusted fleet production : 1,787.04 LCY/hr <br />Total job time : 2.48 Hours <br />Total job cost : $1,930 <br />