Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimatins~ Software <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 perday <br />Cost Bre <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />058 State :Colorado Permitlob # : C-96-083 <br />10/16/2006 <br />JRS <br />Abbreviation :none <br />Filename : C083-058 <br />Permit or other job action :Permit Renewa102 <br />Task description :Haul Truck Loadout Subbase to Gob Pile #1 <br />Scraper work team -Scraper :Cat 627G w/push-pull <br />-Push dozer:NA <br />Support equipment-Load area :NA <br />-Dump area : NA <br />County :Delta <br />Site :Bowie No. 2 Mine <br />Road maintenance -Motor grader : NA <br />-Water truck : NA <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scrape2 NA NA NA NA NA <br />Utilization-machine : 100 NA NA NA NA NA <br />-Ripper attachment: NA NA NA NA NA NA <br />Ownerhip cosUhour : $49.73 NA NA NA NA NA <br />Operating cost/hour : $130.19 NA NA NA NA NA <br />Ripper op.cosUhour: NA NA NA NA NA NA <br />OperatorcosUhour: $24.95 NA NA NA NA NA <br />Unit subtotals : $204.87 NA NA NA NA NA <br />Number of units : 2 0 0 0 0 0 <br />Group subtotals : Work : $409.74 Support : $0.00 Maintenance : $0.00 <br />Total work team cosUhour : $409.74 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 6,000 LCY <br />factor : NA volume : 8,000 LCY <br />Source of quantity take-off :Page 2.05-18 <br />Source of estimated swell factor :NA <br />