My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE103950
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE103950
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:57:20 PM
Creation date
11/24/2007 10:38:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
7/31/2007
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Volume I 3.02.2 Reclamation Cost Estimate RN2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 057 <br />Date : 10/16/2006 <br />User: JRS <br />State :Colorado <br />County :Delta <br />Site :Bowie No. 2 Mine <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Permit or other job action :Permit Renewal 02 <br />Task description :Rip Truck Loadout Road <br />>; ;> <br />,::: . <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D9R - 9SU <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 : 1-shank ripper <br />MATERIAL QUANTITIES <br />Alternate methods - <br />Seismic : 4,800 BCY Load factor <br />Area : NA <br />acres <br />Rip depth (ft) <br />Horsepower: 405 <br />Shift basis : 1 perday <br />Selected estimating method : Seismic <br />NA Bank volume : 4,800 BCY <br />NA Volume : NA BCY or CCY <br />Source of estimated quantity :Division Estimate <br />Source of estimated load factor : NA <br />,. <: ,: , <br />_ :. <.: <br />,. <br />HOURLY PRODUCTION <br />Alternate methods - <br />Seismic : Seismic velocity : 5,000 feet/second <br />Unadjusted protludion : 445.80 cu. yds.lhour <br />Area : Avg. ripping depth : NA feeVpass <br />Average ripping width : NA feeUpass <br />Average ripping length : NA feet/pass <br />Average dozer speed : NA feeUminute <br />Average maneuver time: NA minutes/pass <br />Production per unit area : NA acres/hour <br />Unadjusted production : NA cu. yds./hour <br /> <br />TIME AND COST ,. <br />Fleet size : 4 dozers) <br />Unit cost : $0.561 per cu. yd. <br />Unadjusted production <br />per selected method : 445.80 cu. yds./hour <br />Site altitude : 6,000 feet <br />Altitude adjustment : 1.00 (Cat HB) <br />Job efficiency factor : 0.83 (1 shiWday) <br />Net job correction : 0.83 multiplier <br /> <br />Adjusted unit production : 370.01 cu. yds./hour <br />Adjusted fleet production : 1,480.08 cu. yds,/hour <br />Total job time : 3.24 hours <br />Total job cost: $2,693 <br />PermiUjob # : C-96-083 <br />Abbreviation :none <br />Filename : C083-057 <br />
The URL can be used to link to this page
Your browser does not support the video tag.