Laserfiche WebLink
Truck/Loader Team Work cont'd Task # : 014 sheet 2 of 2 <br />Loadinrt Tool Cvcle Time ~: ~ Number of loading tool passes required to~~fill truck : 5 ~ passes <br />Excavators and front shovels -machine cycle time vs. job condition rating : NA <br />-selected value within basic rating : NA <br />Track loaders -material descr.: NA <br />-cycle time elements (min.) : Load : NA Maneuver : NA Dump : 0.100 <br />Wheel and track loaders -unadjusted basic loader cycle time (load, maneuver, and dum{ 0.600 minutes <br />Cycle Time Factors Loading Condition Description Factor (min.) Source <br />Material : Mixed material 0.020 (Cat HB) <br />Stockpile : Conveyor or dozer piled f0 R. high or less 0.010 (Cat HB) <br />Truck ownership : Common ownership of trucks and loaders -0.040 (Cat HB) <br />Operation : Constant operation -0.040 (Cat H8) <br />Dump target : Nominal target 0.000 (Cat HB) <br /> Net cycle time adjustment : -0.050 minutes <br /> Adjusted loader cycle time (total time per loader pass) : 0.550 minutes <br /> Net load time per truck `: 2.300 minutes <br />Truck CVCle Time: 'Oink of lst loafer cyGa campletetl tluring truck exchange if atlj. loatler qGe li me <ezchange time <br />Truck exchange time ": 0.70 minutes........ Adjusted for site altitude : 0.700 minutes <br />Truck load time: 2.300 minutes........ Adjusted for site altitude : 2.300 minutes <br />Truck maneuver and dump time: 1.10 minutes........ Adjusted for site altitude : 1.100 minutes <br />"set at 0 if exchange time < a01. IoeGer rycle time (truck exchange wmpletetl tluring 1st loatler cycle) <br />Truck travel (haul & return) time: Road condition :Finn, smooth, rolling, dirt or light suAaced, watered, maintained <br />Haul route <br />Road <br />segment# Haul distance Grade <br />res. (%) Rolling <br />res. (°/a) Total <br />resistance (%) Speed Travel time' <br />(minutes) <br />1 600 0.00 3.00 3.00 2983 0.756 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Return ro ute : Haul time ": 0.756 <br />1 600 0.00 3.00 3.00 3569 0.395 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />ninutes <br />'travel time shown(or each segmem inGUtles acceleratioNtleceleration atljusimant ReturO time': 0.395 minutes <br />"total haul and return time shown inclutles altitutle adjustment Total truck cycle time : 5.251 minutes <br />Loading tool unit production : 717.50 LCY/hour...... Adjusted for job efficiency : 595.52 LCY/hour <br />Truck unit production : 409.96 LCY/hour...... Adjusted forjob efficiency : 340.26 LCY/hour <br />Optimal no. trucks/loading tool : 2 trucks........... Selected no. trucks/loader : 2 trucks <br /> Adjusted hourly truck team production : 680.53 LCY/hr <br /> Adjusted hourly single tmck/loader team production : 595.52 LCY/hr <br /> Adjusted hourly multiple trucklloader team production : 595.52 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Team(s) Total job time : 103.68 Hours <br />Unit wst : $0.799 /LCY Total job cost : $49,355 <br />