Laserfiche WebLink
CIRCES Cost Estimatinu Software <br />PROJECT IDENTIFICATION <br />Agency or organization name :Colorado Division O/Minerals And Geology <br />Task # : 014 State :Colorado PertniUjob # : C-95-083 <br />Date : 10/13/2006 County :Delta Abbreviation :none <br />User : JRS Site :Bowie No. 2 Mine Filename : C083-014 <br />Permit or other job action :Permit Renewal 02 <br />task description :Haul Fill from Adjacent Material <br />HOURLY EQUIPMENT COST <br />Truck/loatler team -Truck <br />-Loader <br />sport equipment -Load area <br />-Dump area <br />maintenance -Motor grader <br />-Water truck <br />sheet 1 of 2 <br />Area to B-Seam Portal Bench <br />Shin basis : 1 per day <br />CC9st Breakdown : ruck/Load <br />Tmck er Work Team <br />Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loader NA NA NA NA <br />%Utilization-machine: 88 100 NA NA NA NA <br />-Ripper attachment: NA NA NA NA NA NA <br />Ownership wsUhour: $51.61 $68.80 NA NA NA NA <br />Operating cosUhour: $73.54 $80.45 NA NA NA NA <br />Ripper op. cosUhaur: NA NA NA NA NA NA <br />Operator cosUhour: $21.75 $32.96 NA NA NA NA <br />Unit subtotals: $146.90 $182.22 NA NA NA NA <br />Number of units : 2 1 0 0 0 0 <br />Group subtotals : Work : $476.02 Support : $0.00 Maintenance : $0.00 <br />Total work team cost/hour : $478.02 <br />Initial Swell <br />volume: 53,000 CCY factor: 1.165 <br />Source of quantity take-off :Division Estimate <br />Source of estimated swell factor :CAT Handbook <br />Material purchase cost : $0.00 /LCY <br />HOURLY PRODUCTION <br />Truck Caoaciri <br />Truck Payload (weigh!) Basis <br />Material weight <br />Descr.: Decomposed rock - 50% rock, 50% earth Heapetl volume <br />Rated payload : 108,060 pounds Average volume <br />Payload capacity : 37.26 LCY Adjusted volume": <br /> Final truck volume based on number of loader passes ; <br /> ' Wtk volume atllustetl to not exceed 2iBtl payloatl or heapetl volume <br />Loadlna Tool CaoaciN : Job Condition Corrections <br />Rated capacity (nom. heaped} : 8.200 LCY Truck <br />Descr.: Loose material - 1"and over (85 - 90%) Altitude adj.: 1.000 <br />Bucket fill factor : 0.875 Job efficiency : 0.830 <br />Adjusted bucket capacity : 7.175 LCY Net correction : 0.830 <br />Loose <br />volume : 61,745 LCY <br />Total cost <br />Truck Bed (volume) Basis <br />$0 <br />34.80 LCY <br />46.40 LCY <br />40.60 LCY <br />37.26 LCY <br />35.87 LCY <br />Site altitude (R.) : 6,900 <br />Loader Source <br />1.000 (Cat HB <br />0.830 (1 shiR/da <br />0.830 <br />