Laserfiche WebLink
CIRCES Cost Estimatins~ Software <br />PROJECT IDENTIFICATION <br />Task # : 007 <br />Date : 10/132006 <br />User : JRS <br />State :Colorado <br />PermiUjob# : C-96-083 <br />Abbreviation :none <br />Filename :C083-007 <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Permit or other job action :Permit Renewal 02 <br />Task description :Regrade Old Truck Loadout Material <br />HOURLY EQUIPMENT COST <br />County :Delta <br />Site :Bowie No. 2 Mine <br />Basic machine : Cat D9R - 9SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Horsepower: 405 <br />Shift basis : 1 perday <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $56.94 NA <br /> OperatingcosUhour : $104.98 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cosUhour : $32.53 NA <br /> Total unit cosVhour : $194.45 Total fleet cosUhour : $777,$2 <br />MATERIAL QUANTITIES ~~~ ~~ <br />Initial Swell Loose <br />volume : 9, 790 CCY factor : 1.165 volume : 11,405 LCY <br /> <br />Source of estimated volume :Page 3.02-2 <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 150 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 910.5 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshift/day) <br />Compacted fill or embankment Spoil pile : 0.80 (fnd-rf) <br /> Push gradient : 0.79 (Cat HB) <br />Average push gradient : 10,00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,500 feet Material weight : 0.79 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2, 900 Ibs/LCY Net correction : 0.28 <br />Weight description <br />Decomposed rock - 50% Rock, 50% Earth <br />JOB TIME AND COST <br />Fleet size : 4 Dozers} <br />Unit cost : $0.764 /LCY <br />Adjusted unit production <br />Adjusted fleet production <br />Area <br />Total job time <br />Total job cost: <br />254.55 LCY/hr <br />,018.20 LCY/hr <br />11.20 Hours <br />