Laserfiche WebLink
CIRCES Cost Estimating Software <br /> HYDRAULIC EXCAVATOR WORK <br />PROJECT IDENTIFICATION <br />Task # : 006 State :Colorado Permitfjob # : C-96-083 <br />Date : 10/16/2006 County :Delta Abbreviation :none <br />User : JRS Site :Bowie No. 2 Mine Filename : C083-006 <br />Agency or organization name :Colorado Division Of Minerals And geology <br />Permit or other job action :Permit Renewal 02 <br />Task description :Pull Back Material at Old Truck Loadout Material Storage Area <br />HOURLY EQUIPMENT COST <br />Machine description :Cat 3656 L Series 11(2005) Horsepower : 404 <br /> Weight (MT) : 70.25 <br />Cost Breakdown : Utilization <br />Ownership costfhour : $73.40 NA Shift basis : 1 per day <br />Operating cosUhour : $109.03 100 Data source : (CRG) <br />Operator cosUhour : $32.72 NA <br />Total unit cosUhour : $215.14 Total fleet cosUhour : $430.29 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />Job Condition Correction Factors Source <br />Site altitude : 6, 500 feet Altitude atljustment : 1.00 (Cat HB) <br /> Job efficiency adjustment : 0.83 (1 shitUday) <br /> Net job correction : 0.83 multiplier <br /> <br />Unadjusted hourly unit production : 292.58 LCY/hour <br />Adjusted hourly unit production : 242.84 LCYlhour <br />Adjusted hourly fleet production : 485.68 LCY/hour <br /> <br /> <br /> <br />OB TIME AND COST ,: <br />,:: <br />,., ;: <br />Fleet size : 2 excavator(s) Total job time : 23.48 hours <br />Unit cost : $0.886 per LCY Total job cost : $10,105 <br />