• <br /> Actual mining/excavation activities will commence at the ramp location shown on the Mining <br /> Plan Map(at east permit boundary)and progress south then west then northwest and finally back <br /> to the northeast. If slightly more than 3 acres are excavated during each crusher mobilization then <br /> approximately 10 to I I years will be required to fully develop the pit. If less than 3 acres are <br /> mined during each crusher mobilization or market demands are low, 15 to 20 years may be <br /> required to fully develop the site. <br /> (ii) A description of the size and location of each area to be reclaimed during each phase. <br /> As already stated, approximately 3 to 4 acres may be mined during each stage or phase of <br /> activities at the site(phase or stage being a crushing equipment mobilization to the site). It is <br /> anticipated that there will be concurrent reclamation activities carried out on portions of the <br /> excavated pit, as operationally feasible, once sufficient space is available for both crusher <br /> equipment and topsoil replacement and seeding activities. A total of 20 to 24 acres minimum <br /> within the excavated pit floor area will be necessary in order for concurrent reclamation activities <br /> so that sufficient room remains in the pit floor area for crusher equipment staging and product <br /> stockpiles. <br /> It is possible that smaller areas may undergo concurrent reclamation as the pit floor size increases <br /> if product stockpiles are reduced and/or equipment and loading hauling areas are limited. It is <br /> estimated that within the first five(5)years of operations at the proposed site, 3 to 5 crusher <br /> mobilizations may occur. If 3 to 4 acres are mined with each mobilization the size of <br /> disturbed/mined area could range from 9 to possibly 20 acres total. As previously stated in(i) <br /> above: If slightly more than 3 acres are excavated during each crusher mobilization then <br /> approximately 10 to I I years «ill be required to fully develop the pit. If less than 3 acres are <br /> mined during each crusher mobilization or market demands are low, I S to 20 years may be <br /> required to fully develop the site. <br /> (iii) An outline of the sequence in which each stage or phase of reclamation will be <br /> carried out. <br /> (1) Topsoil stockpile stabilization (broadcast seeding) will occur on topsoil stockpiles left <br /> longer than one growing season. <br /> (2) After 3 to 4 crusher mobilizations,subsequent equipment mobilization will be relocated <br /> to the excavated pit floor and the initial disturbed surface(approximately I I acres) will <br /> be seeded. This initial equipment and stockpile area(shown on the Mining Plan Map) <br /> will be the last area to be mined and eventually reclaimed. It is estimated that up to five <br /> (5)years of operations may be required to allow for sufficient room in the excavated pit <br /> floor for crusher equipment and product stockpiles to be relocated from the"initial" <br /> surface disturbed area to the pit floor area. <br /> (3) As the size of the excavated pit floor area increases, some parts of the pit floor and 3:1 <br /> slopes will have topsoil replaced and be seeded concurrently with continued mining and <br /> crushing activities. <br /> (4) As mining proceeds and the size of the pit floor increases, reclamation activities will <br /> follow the general direction of the mining across the pit floor leaving room for product <br /> stockpiles and crushing equipment. Topsoil will be replaced in these areas and on <br /> adjacent 3:I slopes, seedbeds prepared,and the areas seeded. <br /> (5) At any time or phase/stage of operations at the proposed permit area,areas within the <br /> excavated pit floor may undergo reclamation if these areas are not needed for equipment <br /> staging or product stockpiling. <br />