Laserfiche WebLink
STRUCTURAL DEMOLITION ESTIMATE CONTINUED <br /> EXCAVATION OF TRUCKED ITEMS <br />• <br /> EXCAVATION CREW OF 2 LABORERS WILL BE USED FOR 50% OF MACHINE TIME <br /> TO HANDLE ITEMS AND HELP LOAD ON TRUCKS. <br /> UNIT COSTS CAT 225 + 1/2 OF 2 LABORERS <br /> $73.44 + 2 [ 0.5 x $19.81 ] $93.25 per hour <br /> CAT DBL + 1/2 OF 2 LABORERS <br /> $117.09 + 2 (0.5 x $19.81 ] $136.90 per hour <br /> ITEM MACHINE EXCAVATION UNIT COSTTOTAL COST <br /> USED TIME (HR) ($/hr ) <br /> East Salt Ck. Bridge CAT 225 2.0 $93.25 $186.50 <br /> Water Tank - t0,D00 gal CAT D8L 0.5 $136.90 $68.45 <br /> Fuel Tank - 2,000 gal CAT DBL 1 $136.90 $136.90 <br /> Rock Dust Bin & Foundation CAT 225 2.D $93.25 $186.50 <br /> North Diversion Culvert CAT 225 3.0 $93.25 $279.75 <br /> South Diversion Culvert CAT 225 3.0 $98.82 $296.46 <br /> North Branch Culvert CAT 225 0.5 $93.25 $46.63 <br /> South Branch Culvert CAT 225 0.5 593.25 $46.63 <br /> Road Crossing Culvert CAT 225 0.5 $93.25 $46.63 <br /> McGlone Creek Culvert CAT DBL 1.0 $136.90 $136.90 <br /> Culvert below #2 Gate CAT 225 0.5 $93.25 $46.63 <br /> Sediment Pond Outlet CAT 225 0.5 $93.25 $46.63 <br />• Culvert @ 49+03 CAT 225 D.5 $93.25 $46.63 <br /> Culvert ~ 51+53 CAT 225 0.5 $93.25 $46.63 <br /> Culvert @ 53+76 CAT 225 0.5 $93.25 $46.63 <br /> TOTAL EXCAVATION COST FOR TRUCKED ITEMS $1,664.46 <br /> Metal structure removal = 0.16 X 0.925°,b $lcuft = $0.1734 <br /> ITEMS TO BE BACKSTOWED IN THE MINE <br /> ITEM DIMENSIONS VOLUME/AREA UNIT COSTTOTAL COST <br /> SHOP 8 FOUNDATION DETAILED ON PAGE 5 N/A $4,195.20 <br /> MINE FAN 8 HOUSING 10'X e'X 30' 2,400 CUFT $0.173 $416.16 <br /> MINE PORTAL REMOVAL DETAILED ON PAGES 3 and 4 $2,893.40 <br /> CONVEYOR SYSTEM 8'X B'X 60' 3,840 CUFT $0.173 $665.66 <br /> OFFICE FOUNDATION 18"x3'k54'x6 122 CUFT $0.173 $21.D7 <br /> (two strip footers ea. ) <br /> WATER AND SEPTIC TANKS 3750 GALLONS 500 CUFT $0.173 $86.70 <br /> WIRE FENCE REMOVAL 330 LFT $0.750 $247.50 <br /> GATE REMOVAL tea 1'X 30'X 5' 300 CUFT $0.173 $52.02 <br /> TOTAL COST FOR ITE MS TO BE BACKSTOWED IN MINE $8,577.90 <br />• <br /> TOTAL COST FOR STRUCTURAL DEMOLITION $13,816.22 <br />Mc VOL t - Tbl 3.7-1 Task 20 Page 2 11 - 19 - 98 <br />