Laserfiche WebLink
EARTHWORK ESTIMATING -HYDRAULIC EXCAVATOR <br />Task 13 <br />.TASK DESCRIPTION - Grade diversion ditches The majority of the ditches and the <br />reclamation of the McClave Creek channel will be rough graded <br />as part of the recontouring of the site. Some final grading of the <br />channels will be required to smooth the channels <br />HOURLY EQUIPMENT COST <br />MACHINE MAKE AND MODEL • Cat 325 ATTACHMENTS None <br />OWNERSHIP per hour $30.01 <br />OPERATING per hour $28.89 <br />ADJUSTMENTS per hour none <br />OPERATOR per hour $23.13 <br /> MACHINE COST = <br />MATERIAL QUANTITIES <br />The amount of material to be moved will be insign'rficant when compared to the length <br />of the channels that will be final graded. This estimate will assume that the excavator <br />will be used for two days to final grade the channels. <br />JOB COST <br />• <br />HOURS TO COMPLETE JOB <br />TOTAL MACHINE COST <br />16.00 HOURS <br />$1,312.48 <br />$82.03 <br />TOTAL JOB COST 51,312.48 <br /> <br />Mc VOL 1 - Tbl 3.7-1 Task 13 11 - 19 - 98 <br />