My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE103818
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE103818
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:57:15 PM
Creation date
11/24/2007 10:28:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980004A
IBM Index Class Name
Permit File
Doc Date
5/13/2002
Section_Exhibit Name
TABLES 2.1-1 -- 4.1-5
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EARTHWORK ESTIMATING -DOZER WORK (SINGLE SHIFT) <br />Task 12 <br />• TASK DESCRIPTION - Regrade Sediment pond, office, and sediment drying areas. <br /> INCLUDES CLEANING POND <br /> HOURLY EQUIPMENT COST <br /> MACHINE MAKE AND MODEL - Cat D-8N w/ S Blade ATTACHMENTS 3-shank ripper <br /> OWNERSHIP COST/hr 46.40 <br /> OPERATING COST/hr 51.67 <br /> ADJUSTMENTS none <br /> OPERATOR COST/hr 22.95 <br /> MACHINE COST $121.02 <br /> MATERIAL QUANTITIES <br /> 4,750 CUBIC YDS x 1.10 SWELL = 5,225 CUBIC YDS <br /> VERIFICATION OF VOLUMES FROM Permit Maps <br /> DOZER PRODUCTION <br /> PUSH DISTANCE 100 FT FROM DOZER CURVES UNADJUSTED <br /> ALTITUDE 5600 FT HOURLY PRODUCTION <br /> GRADE 15 ~ AVERAGE 803 CY/HR <br />• JOB CORRECTION FACTORS: <br />OPERATOR REMARKS <br />0.75 average <br /> MATERIAL CONSISTENCY 0.90 Cat tbl <br /> DOZING METHOD 1.00 general <br /> VISIBILITY 1.00 normal <br /> JOB EFFICIENCY 0.83 50 min/hr <br /> SPOIL PILE FACTOR 0.90 <br /> GRADE ADJUSTMENT 1.00 <br /> ALTITUDE ADJUSTMENT 1.00 n/a <br /> M'TL WEIGHT CORRECTION 0.82 n/a <br /> BLADE TYPE 1.00 S Blade <br /> TOTAL JOB CORRECTION FACTOR 0.415 <br /> ADJUSTED HOURLY PRODUCTION 333.35 <br />JOB COST <br />TOTAL MATERIAL VOLUME <br />DOZER PRODUCTION <br />NUMBER OF DOZERS <br />HOURS TO COMPLETE JOB <br />TOTAL MACHINE COST <br />u <br />5,225 CUBIC YARDS <br />333.35 CUBIC YARDS PER HOUR <br />1 <br />15.67 HOURS <br />$121.02 <br />TOTAL JOB COST <br />COST PER UNIT VOLUME <br />$0.363 <br />$1,896.92 <br />Mc VOL 1 - Tbl 3.7-1 Task 12 11- 19 - 98 <br />
The URL can be used to link to this page
Your browser does not support the video tag.