Laserfiche WebLink
O. Provide a copy of the permit or license or documentation from the listed entity that the <br />following aze not required prior to operation: <br />1. The Division of Reclamation, Mining and Safety Permit. <br />2. Colorado Department of Public Health and Environment Fugitive Dust Permit. <br />3. Colorado Department of Public Health and Environment ADEN Permit. <br />4. Colorado Department of Public Health and Environment Storm Water Dischazge Permit. <br />5. United States Department of Labor Mine Safety and Health Administration number. <br />6. Corps of Engineers 404 permit. <br />P. Written documentation from the County Road Foreman or County Reviewing Engineer noting <br />compliance with the following requirements of the County Engineer and County Road Foreman <br />prior to operation of the quarry: <br />]. The intersection of County Road 835C with County Road #19, aka, Siloam Road, should be <br />revamped so that vehicles approach at a right angle, or a perpendiculaz intersection. Instead <br />of a "Yield" sign. <br />2. The existing cattle guazd on County Road #19 (northerly of the site) needs to be widened <br />and replaced. <br />3. As per the County Road Foreman, gravel in the amount of 1500 ton shall be provided <br />annually to assist in increased maintenance of County Road #19. <br />Q. Documentation from the Colorado Department of Transportation as to compliance with any <br />requirements or improvemerits, prior to operation. <br />R. Documentation as to an acceptable sewage disposal source for employees from the Fremont <br />County Environmental Health Department, prior to operation. <br />S. Documentation as to the issuance of a building permit for any buildings, requiring a building <br />permit. <br />T. A copy of an approved well permit for specified use prior to operation. <br />U. Copy of a flood damage prevention permit for any mining which will take place within the <br />FEMA designated flood hazard area. <br />V. Copy of a flood damage prevention permit for any buildings to be constructed within the FEMA <br />_. designated flood hazazd azea. <br />CUP 06.004 Badle Quarry BOCC Comment Letter Page of 3 of 3 <br />