Laserfiche WebLink
depth of topsoil replacement should be at least equal to or greater than the present topsoil depth. <br />Also, the total volume of topsoil to be replaced at the time of maximum disturbance will need to <br />be revised to reflect the application depth specified). Please respond. <br />10. The Division recommends the applicant revise the proposed seed mix for non-riparian and <br />non-wetland areas and incorporate the following seed mix into the reclamation plan for the North <br />Bank Pit: <br />North Bank -Shoreline & Upland Seed Mix <br />Species % of Mix Seed Rate* <br />Intermediate Wheatgrass 15 3.0 <br />Alkalai Sacaton 15 0.5 <br />Slender Wheatgrass 5 0,5 <br />Green Neeglegrass 10 1.0 <br />Orchazdgrass 10 0.5 <br />Sheep Fescue 10 0.5 <br />Western Wheatgrass 20 2.5 <br />Little $luestem 15 1.0 <br /> 100 9.5 <br />Cicer Milkvetch 2.0 <br />Rocky Mnt. Pens[emon 0.5 <br />TOTAL .............................. 12.0 <br />* Ibs/Acre PLS (double seed rate for broadcast seeding) <br />6.4.6 EXHBIT F -Reclamation Plan Map <br />11. The Reclamation Plan Map specifies creation of riparian habitat of 1.7 acres in Cell A and <br />3.3 acres in Cell B. The Reclamation Plan also specifies creation of wetland shelf azeas. Please <br />revise the Reclamation Plan Map - Exhibit F to show the azea(s} where these habitat types will <br />occur and their representative acreages. <br />6.4,7 EXHIBIT G -Water Information <br />12. The applicant specifies that they intend to apply to the State Engineer's Office (SEO) to <br />change the existing water rights for the site to meet the operational needs during mining and final <br />reclamation. Please confirm the status of the permits required during mining and during final <br />reclamation, ie: Temporary Substitute Supply Plan, Well Permit, Augmentation Plan. Also, <br />review comments from the SEO will be forwarded as soon as they become available. Please <br />