Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 001 <br />Date : 02/11/2005 <br />User: WHE <br />Permitfjob# :M-2004-063 <br />Abbreviation :none <br />Filename :M063-001 <br />Agency or organization name :DMG <br />Permit or other job action :112c application review <br />Task description :Highwall reduction from 0.5H:1V to 3H:1V for first year <br />HOURLY EQUIPMENT COST <br />State :Colorado <br />County :La Plata <br />Site :Rocker Gravel Pit <br />Basic machine :Cat D8R Series II - 8SU Horsepower : 310 <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 : NA <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $42.78 NA <br />Operating cost/hour : $66.09 100 <br />Rlpper op. cosUhour : $0.00 NA <br />Operator cosUhour : $31.76 NA <br />Total unitcosUhour : $140.63 Totalfleetcost/hour: $140.63 <br />_ _ .. :: <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 18,667 LCY factor : NA volume : 18,867 LCY <br />Source of estimated volume :See drawing, "Highwall Reduction" <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION Job Condition Correction Faciors ~SOUrce ~~ <br />i <br />Average push distance : 63 feet <br />Unadjusted hourly production : 1,246.9 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient : 10.00 % (i <br />Average site altitude : 6,600 feet <br />Material weight : 2,650 Ibs/LCY <br />Weight description <br />Decomposed rock - 25% Rock, 75% Earth <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.213 /LCY <br />Operator skill : 0.75 <br />Material consistency : 1.00 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.22 <br />Altitude : 1.00 <br />Material weight : 0.87 <br />Blade type : 1.00 <br />Net correction : 0.53 <br />HB) <br />HB) <br />Adjusted unit production : 660.21 LCY/hr <br />Adjusted fleet production : 660.21 LCY/hr <br />Total job time : 28.27 Hours <br />Total job cost : $3, 976 <br />