Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 003 <br />Date : 02/10/2005 <br />User: WHE <br />State :Colorado <br />County :La Plata <br />Site : Hocker Gravel Pit <br />Agency or organization name :DMG <br />Permit or other job action ;112c application review <br />Task descdption :Replace topsoil 1 inch over 19.4 acres Phase 1 <br />HOURLY EQUIPMENT COST <br />310 <br />Basic machine : Cat D8R Series ll - 8U Horsepower : <br />Blade type : Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 : NA <br /> Data source : (CRG) <br /> Utilization <br />Cast Breakdown : Ownership cosUhour : $42.78 NA <br />Operating cosUhour : $66.09 100 <br />Ripper op.cosUhour : $0.00 NA <br />Operator cosUhour : $31.76 NA <br />Total unit cosUhour : $140.63 Total fleet costlhour : $140.63 <br />MATERIAL QUANTITIES <br />Initial Swe11 Loose <br />volume: 2,504 LCY factor: NA volume: 2,504 LCY <br />Source of estimated volume :(19.4ac)(43560sf/ac)(0.08'D)/27 = 2,503.9 cy <br />Source of estimated swell factor : NA _ <br />HOURLY PRODUCTION <br />Average push distance : 300 feet <br />Unadjusted hourly production : 314.3 LCY/hr <br />Material consistency description <br />Partly consolidated stockpile <br />Average push gradient : 5.00 % (ne <br />Average site altitude : 6,600 feet <br />Material weight : 2,550 Ibs/LCY <br />Weight description <br />Earth -Dry packed <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.812 /LCY <br />Operator skill : 0.75 <br />Material consistency : 1.10 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.11 <br />Altitude : 1.00 <br />Material weight : 0.90 <br />Blade type : 1.00 <br />Net correction : 0.55 <br />Adjusted unit production : 173.15 <br />Adjusted fleet production : 173.15 <br />PermiUjob# : M-2004-063 <br />Abbreviation :none <br />Filename : M063-003 <br />Total job time : 14.46 <br />Total job cost : $2,034 <br />Source <br />(Cat <br />LCY/hr <br />LCY/hr <br />Hours <br />