My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE103522
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE103522
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:57:03 PM
Creation date
11/24/2007 10:09:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004063
IBM Index Class Name
Permit File
Doc Date
2/14/2005
Doc Name
Financial Warranty
From
DMG
To
Hocker Construction LLP and Southwest Land Services Inc.
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />Task # : 002 <br />Date : 02/10/2005 <br />User : WHE <br />State :Colorado <br />County : La Plata <br />Site : Hocker Gravel Pit <br />Agency or organization name :DMG <br />Permit or other job action :112c <br />Task description :Rep <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R Series 11 - 8U Horsepower : 310 <br />Blade type :Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 : NA <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosf/hour : $42.78 NA <br />Operating cost/hour : $66.09 100 <br />Ripper op. cosUhour : $0.00 NA <br />Operator cost/hour : $31.76 NA <br />Total unit cosUhour : $140.63 Total fleet cosUhour : $140.63 <br />MATERIAL QUANTITIES ~ ~~ ~ ~ ~~- <br />Initial Swell Loose <br />volume : 48,400 LCY factor : NA volume : 48,400 LCY <br />Source of estimated volume : (15ac)(43560sf/ac)(2'D)/27 = 48.400 cy <br />Source of estimated swell factor :NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 200 feet <br />Unadjusted hourly production : 515.8 LCY/hr <br />Material consistency description <br />Partly consolidated stockoile <br />Average push gradient 7.00 % (i <br />Average site altitude : 6,600 feet <br />Material weigfit : 2,650 Ibs/LCY <br />Weight description <br />Decomposed rock - 25% Rock, 75% Earth <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />:anon review <br />OVB 2' deep, 15 acres of Phase i area <br />Unit cost : $0.449 /LCY <br />Operator skill : 0.75 <br />Material consistency : 1.10 <br />Dozing method : 1.10 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.16 <br />Altitude : 1.00 <br />Material weight : 0.87 <br />Blade type : 1.00 <br />Net correction : 0.61 <br />Adjusted unit production : 312.86 LCY/hr <br />Adjusted fleet production : 312.86 LCY/hr <br />Total job time : 154.70 Hours <br />Total job cost : $21,755 <br />PermiUjob# : M-2004-083 <br />Abbreviation :none <br />Filename : M063-002 <br />SI) <br />
The URL can be used to link to this page
Your browser does not support the video tag.