My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE103522
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE103522
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:57:03 PM
Creation date
11/24/2007 10:09:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004063
IBM Index Class Name
Permit File
Doc Date
2/14/2005
Doc Name
Financial Warranty
From
DMG
To
Hocker Construction LLP and Southwest Land Services Inc.
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 001 <br />Date : 02/]0/2005 <br />User: WHE <br />County :La Plata <br />Site : Hocker Gravet Pit <br />Agency or organization name : DMG <br />Permit or otherjob action :112c <br />Task description : Higl <br />HOURLY EQUIPMENT COST <br />3tion review <br />reduction from 0.5H:1V to 3H:1V <br />Basic machine :Cat D8R Series 11 - 8U <br />Blade type :Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 : NA <br />Shift basis : 1 per day <br />Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $42.78 NA <br /> Operating cosUhour : $66.09 100 <br /> Ripper op.cosUhour : $0.00 NA <br /> Operator cosUhour : $31.76 NA <br /> Total unit cosUhour : $140.63 Total fleet cosUhour : $140.63 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 53,200 LCY factor : NA volume: 53,200 LCY <br /> <br />Source of estimated volume :See drawing, "Highwall Reduction" <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION ~~~ Job Condition Correction Factors Source ~~ <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 63 feet Material consistency : 1.10 (Cat HB) <br />Unadjusted houdy production : 1,438.4 LCY/hr Dozing method : 1.10 (50% sl) <br /> Visibility : 1.00 (avg.) <br />Material consistency description <br />Partly consolidated stockpile <br />Average push gradient : 10.00 % (r <br />Average site altitude : 6,600 feet <br />Material weight : 2,650 Ibs/LCY <br />Weight description <br />Decomposed rock - 25% Rock, 75% Earth <br />Job efficiency : 0.83 (lshiff/da <br />Spoil pile : 0.80 (fnd-rfl <br />Push gradient : 1.22 (Cat HB <br />Altitude : 1.00 (Cat HB <br />Material weight : 0.87 (Cat HB <br />Blade type : 1.00 (S/SU/L <br />Net correction : 0.64 <br />Adjusted unit production : 921.54 LCY/hr <br />Adjusted fleet production : 921.54 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 57.73 Hours <br />Unit cost : $0.153 /LCY Total job cost : $$,118 <br />State :Colorado <br />Permiujob# :M-2004-063 <br />Abbreviation :none <br />Filename : M063-001 <br />Horsepower: 310 <br />
The URL can be used to link to this page
Your browser does not support the video tag.