Laserfiche WebLink
TAHR S[ockoiles <br />All existing TAHR topsoil stockpiles (A, C, D, E, F, and G) and temporary waste stockpile <br />(THS) have been approved as small area exemptions in TR-8, Catchment berms were <br />constructed around the perimeter of the stockpiles to divert runoff to catchment sump <br />locations. These catchment sumps were field located to contain the runoff from the <br />stockpiles. Since these structures are no longer required, they will be regraded to <br />ensure that no water is impounded. <br />r~ <br />~~ <br /> <br />13-8-3 Revised 11/05/93 <br />