My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE103509
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE103509
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:57:03 PM
Creation date
11/24/2007 10:09:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
DESIGN FOR CATCHMENT SUMPS OF SAE TOPSOIL STOCKPILES
Section_Exhibit Name
TAB 13 ATTACHMENT 13-8
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Size Determination • <br />Once the existing size in acres of a topsoil pile location is determined, a required <br />catchment basin capacity can be determined by utilizing SEDCAD The capacities shown on <br />Figure 13-8-1 are minimum required capacities and must be increased to allow for adequate <br />freeboard. For a well vegetated topsoil stockpile (CN = bt), there is no runoff to <br />contain until the watershed area of the stockpile is greeter than 3.5 acres. See Addendum <br />1 for the SEDCAD input and output. Since there is no runoff from a 10-year, 24-hour <br />storm event from these well vegetated stockpiles, a catchment sump is not required. <br />Topsoil Stockpiles A, C, D, E, F, G, T45, 86, and J require no catchment sumps. Topsoil <br />Stockpiles PP, DO, and RR require catchment sumps and ditches. Addendum 2 contains the <br />SEDCAD inputs and outputs for these stockpiles. <br />Construction <br />The catchment basins will 6e field located based on existing topography to ensure that all <br />runoff will be incepted and contained. All side slopes will be th:1v or flatter and the <br />minimum depth shall be 3.0 feet. Figure 13-8-1 shows a typical topsoil pile catchment • <br />basin, After construction, catchment sumps will be certified to ensure adequate capacity. <br />cable 13-8-2 shoos the design and actual capacity of the constructed catchment sumps. the <br />as-built construction certification of the sumps for Topsoil Stockpiles PP, 00, and RR are <br />depicted on Exhibits 13-BPP, 13-800, and 13.8RR, respectively. The catchment basins will <br />be reclaimed the same as a containment ditch or sedimentation pond according to the <br />approved permit when no longer required to control runoff. <br />Catchment Ditches <br />Catchment ditches may be utilized to contain runoff from SAE stockpiles to catchment sumps <br />for containment. Ditches will be designed as en erodible, v-ditch channel with side <br />slopes of 1h:ty, and 0.3 fee[ of freeboard. Table 13-8-3 lists the catchment ditch design <br />parameters. The catchment ditches will be routinely inspected for erosion and maintained <br />to ensure adequate capacity. The catchment ditches will be reclaimed when the topsoil <br />stockpile is removed. <br /> <br />13-8-2 Revised 11/05/93 <br />
The URL can be used to link to this page
Your browser does not support the video tag.