Upper Block. A box cut will be opened in the center of the upper block in 1992. Scrapers will most <br />likely be used to assist the dragline in uncovering the coat, especially in the northwest Ilowerl end of <br />the box cut and possibly the cropline coal on the east side. The overburden depth in this area <br />approaches 90 feet. As stated earlier, the dragline will alternate between this block and the lower <br />block. The next pit in this area will be in 1993, adjacent to the box cut. Pit progression will take place <br />on bath sides of the box cut. As with the lower block, this schedule may be deviated to adjust for <br />unforeseen circumstances and the pit sequenced may vary from that shown on Exhibit 12-2. The <br />economic recovery line should be reached in 1996. <br />Haulage to and from this area will be on Haul Roads A and G. The empty trucks will proceed to this <br />block up Haul Road A. The loaded trucks will travel down Haul Road G. ("') In good weather Haul <br />Road G may be used as both an in and out road. <br />South Block The pit layout in the south block deviates from the general mining configuration in the <br />areas to the north where the pits are aligned perpendicular to the coal cropline. In the south area, pit <br />configuration is constrained by a steepening of the dip of the coal seam and the resulting rapid increase <br />in overburden depth as mining progresses away from the cropline. In this area, mine pits and <br />progressive development will occur parallel to the cropline. Development of the south block will <br />proceed directly from the final cut in the lower block. As shown by Exhibit 12-3, a narrow pit will be <br />extended to the south along the Wadge seam cropline from the final pit highwall in the lower block. <br />Given the initial pit configuration, some development material may be moved by scrapers to facilitate <br />partial backfilling of the final cut in the lower block: The pit will be widened and extended fuither to <br />the south and west, following the Wadge seam outcrop. A box cut will be opened approximately in the <br />middle of the south extension mining area where the outcrop extends around a natural topographic <br />feature. The resulting pit will connect with the main pit with mining continuing to the south and west <br />to the defined reserve limit. Once the final highwall is established, angering operations will be <br />conducted and progress to the south, as shown on Exhibit 12-3. All aspects of the angering operations <br />are described in Attachment 12-2, Auger Mining. <br />Initially, coal will be hauled from the south block using Haul Road H, which will be extended from <br />existing Haul Road A. As mining proceeds to the south, the haul road network will be extended with <br />construction of additional Haul Roads, I, J, and K. In order to minimize overall mining-related <br />disturbance, new haul roads will be extended from existing roads with Haul Road I connecting to Haul <br />Road H and Haul Road K connecting to Haul Road J as shown by Exhibit 12-3. <br />It should be stressed that all mine progression and sequencing dates are for esuma[ing purposes only. <br />Due to fluctuating power plant demand, coal orders could increase or decrease on a monthly basis. <br />This will effect the overall pit sequencing, but not the general mining direction. <br />• <br />8 Revised 04/00 <br />