Laserfiche WebLink
Task 027 SLB Addendum to New Horizon Mine Reclamatlon Cost Estimate <br />C-1981-008 10/11/2006 Repace PawerLines <br />Replace power lines on BB and 2700 Roads <br />Based on San Miguel estimate 565,705.00 <br />Task 028 SLB Addendum to New Horizon Mine Reclamation Cost Estimate <br />C-1981-008 10/11/2008 Replace Telephone Lines <br />Replace telephone lines an BB and 2700 Roads <br />Based on Nucla/Naturita Telephone Company estimate 576,900.00 <br /> <br />u <br />(Revised 24May07) Attachment 3.02.2-2-34 <br />