Laserfiche WebLink
• Task 025 <br />C-198'1-008 <br />SLB Addendum to New Horizon Mine Reclamatlon Cost Estimate <br />10/4/2006 Replace CCC Pipeline <br />Replace 4,100' of buried 26" HDPE line, assume 8' depth for 6' cover <br />Item Units Qty Unit $ Total $ <br />Excavation bcy 3844.00 $1.74 $6,340.56 <br />Pipe Iin.R 4,100.00 $55.50 $227,550.00 <br />Fill Icy 4373 $0.74 $3,238.02 <br />Total $237,126.58 <br />6ccavation <br />Pipe <br />Fill <br />• <br />• <br />Means 02315 610 0620 <br />Means 02510 760 3000 <br />Means 02315 520 0020 <br />(Revised 24May07) Attachment 3.02.2-2-33 <br />