My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE103125
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE103125
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:56:46 PM
Creation date
11/24/2007 9:39:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
Tipple EXHIBIT 10 NPDES PERMIT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />PART II <br />Page 13 of 19 <br />A. MANAGEMENT REQUIRFryENTS (CONTINUED) <br />7. Upsets <br />a) Effect of an upset <br />An upset constitutes as affirmative defense [o an action brought <br />for noncompliance vith technology-based permit effluent limitations <br />if the requirements of paragraph (b) of this section are met. No <br />determination made during administrative review of claims that <br />noncompliance vas caused by upset, and before an action for <br />noncompliance, is final administrative action subject to ,judicial <br />reviev. <br />b) Conditions necessary for a demonstration of upset <br />• <br />A permittee vho wishes to establish the affirmative defense of <br />upset shall demonstrate through properly signed contemporaneous <br />operating logs, or other relevant evidence that: <br />(i) An upset occurred and that Che permittee can identify the <br />specific cause(s) of the upset; <br />(ii) The permitted facility vas at the time being properly <br />operated; and <br />(iii) The permittee submitted notice of the upset as required in <br />Part II A.3 of this permit (24-hour notice). <br />(iv) The permittee complied with any renedlal measures required <br />under Section 122.7(d) of the federal regulations. <br />c) Burden of proof <br />In any enforcement proceeding the permittee seeking to establish <br />the occurrence of an upset has the burden of proof. <br />8. Removed Substances <br />Solids, sludges, or other pollutants removed in the course of [reagent <br />or control of wastewaters shall be disposed of Sn a manner such as to <br />prevent any pollutant from such materials from entering waters of the <br />State. <br />• Code: i - 27 Date: 1 - 84 <br />
The URL can be used to link to this page
Your browser does not support the video tag.