Laserfiche WebLink
<br />A. MANAGEMENT REQUIREMENTS (CONTINUED) - <br />PART II <br />Page 12 of 19 <br />4. Submission of Incorrect or Incomplete Information <br />Sihere the permittee failed to submit any relevant facts in a permit <br />application, or submitted incorrect information in a permit application <br />or report [o the Division, the permittee shall promptly submit the <br />relevant application information which vas not submited or any <br />additional information needed to correct any erroneous information <br />previously submitted. <br />S. B ass <br />1) Bypass is prohibited, and the Division may take enforcement action <br />against a permittee for bypass, unless: <br />a) The bypass did not cause effluent limitations to be ezceeded <br />and vas for essential maintenance to assure efficient operation; <br />b) Bypass vas unavoidable to prevent loss of life, personal <br />injury, or severe property damage; <br />• c) There were no feasible alternatives to the bypass, such as the <br />use of auxiliary treatment facilities, retention of untreated <br />wastes, or maintenance during normal periods of equipment <br />downtime. This condition is not satisfied if the permittee <br />could have installed adequate backup equipment to prevent a <br />bypass which occurred during normal periods of equipment <br />dowtime or preventative maintenance; and <br />d) The permittee submitted notices as required in "Bypass <br />Notification', Part II.A.6. <br />6. Bvnass Notification <br />If the pezmittee knows in advance of the need for a bypass, a notice <br />shall be submitted, at least ten days before the date of the bypass, to <br />the Division and the Environmental Protection Agency (EPA). :ne bypass <br />shall be subject to Division approval and limitations imposed by the <br />Division and EPA. <br /> <br />Code: i - 26 Date: 1 - 84 <br />