.[reining facility to the manhole north of the bathhouse facility. Approximately 130 feet of water line will be buried <br />¢feet deep and extend from the water supply line east of the main office to the proposed site. Conduit, power line, <br />• and communication lines will also be buried to service this facility. An existing berm southeast of the engineering <br />trailer will be graded to the south to accommodate the new training facility. The existing ditch along the <br />southwestern edge of the employee parking likewise will be moved to the west to divert surface flow from the <br />mantrip parking lot into ditch D-4. The retreated ditch will be lined with belting for its entire length. <br />The concrete, building, and walkway will be demolished when no longer required and disposed of on site. <br />Water Line <br />A proposed high-density polyethylene water line will extend from Location 6 to the south side of the Operations <br />center. The water line is a 6" l-IDPE and will be buried a minimum of six feet. <br />Two hydrants (Mueller 4 %z) will be installed above the surface to access the new water line. The hydrants will be <br />removed when no longer required. <br />Access Water Line <br />A proposed high-density polyethylene water line will extend from Location 6 to the East Side of the main office <br />and then continue to the South Side of the Operations center. The water line is 4" in diameter and will be buried six <br />feet beneath the surface. <br />One hydrant will be installed above the surface to access the new water line. The hydrant will be removed when no <br />longer required. <br />• Batchway Water Line <br />A proposed high-density polyethylene water line will extend from the Batchway towards the stack tube for <br />approximately 500 feet. The water line is 4" in diameter and will be buried six feet beneath the surface. <br />No apparatuses will be installed above the surface. <br />Telephone Pole and Cable Addition <br />Ten new telephone poles are planned for installation along the existing gravel road entrance onto the mine site from <br />county road 27. Each of these poles is 30 feet in length and will support an additional 4400 feet of communication <br />lines to service the TCC facility. The project design suggests 6 to 14 new telephone poles as a possibility, but all <br />present plans and figures are based on ten poles only. <br />The additional telephone poles will be removed when no longer needed. <br />Prep_Plant Storage Building <br />A storage building is proposed for storage of materials and equipment for use at the prep plant. This building will <br />be wnstructed approximately 4 feet south of the overland belt and 200 feet east of the prep plant. The foundation <br />for this building will consist of sixteen 16-inch diameter concrete piers poured in place and 6 feet deep. A 6-inch <br />reinforced concrete floor will be poured on top of these piers with dimensions of 30' 6" by 42' 2". The building <br />will be wood and steel frame with metal siding. Dimensions of the building are 30'6" by 42'2" by 22' higfi. The <br />bui5t5ing -cvm55 be demo'na'ne8 ~hi~n na Ytmger rtrctnirred. <br />• <br />APPROVED OAT o 5 ~ggg <br />MR 98-160 2.05-61.1 9/18/98 <br />