Stoker Truck Self-Loading System <br />TCC plans to install aself-loading system for the stoker trucks that are currently being loaded using a front end <br />loader on [he west side of [he Prep Plan[. This system will require the installation of a multi-plate mmtel with hvo <br />feeders, an escape tube, conveyor structure, MCC building, retaining wall, and widening of Haulroad B. <br />A 12 foot diameter, 10 gauge multi-plate tunnel will be buried below the existing Broker pile. This tunnel will be <br />approximately 100 feet long and buried to a depth of 14 to IS feet below grade. A total of 100 cubic yards of <br />concrete will be required to install the tunnel. Two FCM Vibratory Syntron Feeders will he placed under the tunnel <br />[o reclaim the stoker coal. I[ is estimated [hat 20 cubic yards of concrete will be required in the area where these <br />feeders are located. The tunnel will also include a 36 inch buried corrugated pipe escape tube extending from the <br />tunnel approximately ~0 feet [o the south. One cubic yard of concrete will be required at the point where [he escape <br />tube daylights. A I50 foot long 36 inch com~eyor will extend from within the tunnel to discharge directly into the <br />stoker trucks. Two yards of concrete will be required for a pad to support the structure. An MCC building will be <br />constructed near the escape tube exit. Dimensions of this building will be 15 fee[ b}• I S feet with a concrete Floor <br />requiring approximately 2 cubic yards of concrete. <br />A retaining wall will be constructed on the north side of [he existing pile. The wall will require 6 steel piles driven <br />to a depth of 25 feet with treated cribs placed between the piles to form the wall. When romplete, this wall will be <br />50 feet long and up to 12 feet in height. <br />Haulroad B will be widened by approximately 20 feet to allow for a loading area with room for traffic to pass <br />trucks that are loading. The emergency spillway elevation of Pond E will be staked and the toe of the fill will no[ <br />extend past this line to ensure that no storage capacity is lost. Topsoil will be stripped and salvaged on the topsoil <br />srockpile east of Pond E if the haulroad widening extends below the west of the pond embankment. No <br />construction will occur within a buffer zone of 100 feet from Foidel Creek. Silt fences, hay bales, rock filters, or a <br />• combination of these control measures will be used as required to prevent sediment from washing into Foidel Creek <br />fiom the new fill material or road section. <br />Reclamation associated with these additions will occur when the prep-plant facility is dismantled. The concrete <br />will be broken up and disposed of on-site. The steel associated with these additions will be either salvaged or <br />disposed of on site. <br />EneineeringTrailer <br />An additional engineering trailer is planned to be placed on the south side of the existing engineering trailer. This <br />rtew trailer will be 14 feet wide by 70 feet long and approximately 20 feet high of composite wood and metal <br />construction. No plumbing for water or sewer is associated with this trailer, but it will be wired for electrical. The <br />building will be removed when no longer needed. <br />Training- acility <br />The intended location of the trailer is on the southeast corner of die existing engineering trailer. This new facilih• <br />will he approximately 28 feet wide by 61 feet long and 16 feet high with the foundation. The building is a <br />composed of a wood and metal construction. A wooden walkway will be built on both the front and back of the <br />trailer with footages of 5 feet b}' 40 feet and 5 feet by 20 feet. One ramp and one stairway, totaling 350 cf will be <br />constructed for the walkway entrances. This potential site will be located on a disturbed area, which already <br />maintains a stable topsoil stockpile. <br />Approximateh~ 46 CY of concrete will make up 192 cf of the footer, 1008 cf of [he foundation stem walls, and 7.5 <br />cf of the 6 pads for the adjustable piers. There will be a sewer line buried 2 to 4 fee[ deep from the proposed <br />[raining faciliq• ro [he manhole north of [he bathhouse facility. Approximately 130 feet of water line will be buried <br />4 feet deep and extend from the water supply line east of the main office to the proposed site. Conduit, power line, <br />MR98-159 2.05-61 APPROVED JUL o 2 ~ggg 6/24/98 <br />