+vidt a topsoil depth of 42 inches. Topsoil will be salvaged on one side of the trench and subsoil materials will be <br />salvaged on [he other side. Subsoil and topsoil will be replaced immediately after waterline installation. <br />Reseeding of the disturbed area will be conducted during the tirst appropriate planting period . <br />I3a[ch Weigh/loadout System <br />A batch wei~~h [rain loadout system and associated support facilities will be constructed generally southeast of the <br />Tipple 2 product stockpile and flood loadout facility formerly utilized as the primary means for loading [rains (see <br />Map 24, Surface Facilities and Freshwater Systems). The batch weigh system and associated facilities will consist <br />of a stacking conveyor, a stacktube, a coal stockpile, a reclaim tunnel, an escape tube, a reclaim conveyor, a motor <br />control center, associated powerlines, a new access road, and a batch weigh/loadout system building and <br />washdown water drain line to Pond C. The layout of the batch weigh system facilities is shown on Map 24. <br />Powerlinc construction for this facility will be addressed as a separate minor revision application. TCC will also <br />construct a sump, as previously approved in TR 95-20. <br />The stacking conveyor build from the existing Tipple 2 sample building [o [he batch weigh system coal stockpile <br />stacktube will be 54" wide, 520 feet in length, and will be constructed with three bents to support the conveyor. <br />Two of the bents will have hvo legs and one will have four legs. Spread footings will be used as foundations for <br />the bents. The conveyor will be supported by a bent placed just outside the existing Tipple 2 sample building. <br />Trusses will carry the conveyor out of [he existing building [o the stacktube situated above [he reclaim tunnel. A <br />head house mounted on top of the stacking tube will house the conveyor drive. A ++•alkway will run along the side <br />of the conveyor Conveyor foundations will be supported by caissons. <br />fhe stackuibe will he a concrete structure 14 feet in diameter and 115 fee[ tall. There will be twenty-six (26) 4' x <br />• 4' framed openings with hinged dust flaps in [he stacktube. The stacktube will accommodate a coal stockpile <br />approximately 300 feet in diameter at the ground surface and approximately 100 feet tall. The coal stockpile cone <br />will have a storage capacity of approximately 78,000 tons. Additional coal storage of 82,000 tons will be <br />provided, if necessary, by extending the pile in a southwesterly direction, resulting in a maximum of 160,000 tons <br />of coal storage at [he batch weigh site. <br />The stacktube and coal stockpile will be located above a reclaim tunnel. The tunnel will be below grade, 330 feet <br />long, and approximately 10' x 13' in cross section. A sump will be constructed at [he low point of [he tunnel. <br />An automatically controlled sump pump will convey collected water from the reclaim tunnel to ditch <br />D- I. Approximately 3,500 yards of excess material will be excavated in construction of the reclaim tunnel. The <br />excavated materials will be stored adjacent to the site by respreading to provide a uniform surface and to create <br />uniform drainage from the site toward Ditch D-I. <br />The escape tube will provide alternative access to the reclaim tunnel. The tube is designed to be approximately <br />150 feet long and will be constructed of 48" diameter CMP pipe or other suitable material. The escape tube <br />structure will be equipped with an exhaust fan and a door. <br />The reclaim conveyor will carry coal from the reclaim tunnel [o the batch weigh/loadout building. the reclaim <br />conveyor belt will be 72" wide and approximately 700 fee[ long. Above grade there will be a walkway on the side <br />of the am+•eyor. The reclaim conveyor will be constructed similarly to the stacking conveyor and will be <br />supported above-ground on three bents. Two of the bents will be located on the batch weigh system product pile <br />side (south) of [he existing overland conveyor. The third bent will be located on the north side of the existing <br />overland conveyor. Trusses supported on a double bent will support the reclaim conveyor behveen the overland <br />• conveyor and the batch weigh/loadout building. <br />The ne++' MCC building will be constructed at the location depicted on Map 24. The building will be a steel- <br />framed, metal-sheathed building constructed on a concrete foundation. Building dimensions will be 20' x 20~ x <br />MR 97-154 2.05-56 Revised 9/9/97 <br />