My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE103109
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE103109
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:56:46 PM
Creation date
11/24/2007 9:39:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056A
IBM Index Class Name
Permit File
Doc Date
7/19/2002
Doc Name
pages 2.05-1 to 2.05-100.1
Section_Exhibit Name
2.05 Operation and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
In order to reduce the amount of refuse hauled to the refuse pile TCC will pump [he thickener underflow directly into <br />• the underground works.'fhe material will be pumped into the mined out longwall panels in the Eastern Mining District. <br />The underFlow will be pumped via a 4" line to an existing fresh water borehole into the mine. The bottom of the <br />borehole will be plumbed into a pipeline terminating at a discharge point located behind the seals in the EMD. The <br />process is described in greater detail in Rule 2.05.3(9). <br />Afrer the low quality coal is processed, clean coal is transferred directly onto the overland belt or transferred via <br />conveyor to a clean coal stockpile adjacent to the preparation plant. A front end loader will be used to transfer the <br />stockpiled clean coal to a bin on the overland belt. The clean coal will then be transferred via the overland belt to the <br />tipple. The processed clean coal may also be utilized in the production of stoker coal with the stoker coal stockpile <br />located on the west side of the preparation plant. The refuse material generated during the washing process is <br />transferred via a conveyor belt to a refuse bin. This refuse is then placed in the approved refuse pile, or when sufficient <br />low quality coal has been removed from the pit the refuse will be returned to the pit. As an initial result of processing <br />the low quality coal material, coarse material consisting primarily of 4 inch plus waste rock is screened from the low <br />quality coal and diverted to a chute and temporary storage area on the north side of the preparation plant. Typically, <br />this material is periodically placed in the approved waste pile along with the coal refuse generated from the <br />• <br /> <br />TR 01-39 2.05-30.1 8/10/0] <br />
The URL can be used to link to this page
Your browser does not support the video tag.