My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE102972
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE102972
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:56:40 PM
Creation date
11/24/2007 9:29:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984028
IBM Index Class Name
Permit File
Doc Date
2/6/1984
Doc Name
LIMITED IMPACT 110 AND SPECIAL TEN DAY 111 PERMIT APPLICATION FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />P-2 <br /> <br />Principal mining activity will begin in the northwest <br />of the designated area and proceed generally west in ] <br />of the operation. (See Exhibit B-2). As will be seen <br />phase has been divided into Phase lA & Phase 1B. Pha; <br />take place simultaneously in the southwest quadrant o: <br />in order to allow removal of road-grade quality mater, <br />ly into trucks and transportation off the site. <br />As noted in Exhibit B-2, there presently exists a top <br />pile in the extreme northeast corner of the site. Th <br />was removed by the previous operator from the area al <br />ly encompassed in Phase lA. There is an estimated 15 <br />topsoil, overgrown with weeds and apparently well pro <br />wind and water erosion. In the event additional tops <br />ed to the pile, or should it become necessary to shif <br />lion, then the stockpile will be regraded and reseede <br />in the Reclamation Plan (Exhibit E). <br />Mining in both Phase lA and Phase 2 will begin near t <br />boundary of each area, moving south to north as activ <br />in a westerly direction. In this manner backfilling <br />of the embankment created along the north boundary of <br />Hated area can be completed as a part of the mining o <br />In addition to fines generated in this area, the mini <br />will encounter spoil piles left on the surface in som <br />Mining is expected to open a pit area that is approxi <br />to 18' below the surface of the surroundsn undisturb <br />The embankments will be regraded to a 3:1 r flatter <br />preparation for subsequent reclamation. <br />Mining in Phase 1B, will encounter virtually no topsoi <br />In this location mining may go even deeper than 18', d <br />upon the extent of the deposit. The quality of the m <br />along the western boundary of the site will greatly in <br />any decision to expand the operation in the future. V <br />no backfilling is expected in this area during the cou <br />mining. Due to the instability of the material in its <br />state, sloping will take place with little assistance <br />operator until such time a decision can be made to exp <br />reclaim this area as set forth in the Reclamation Plan <br />Phase 1B will join up with Phase 2. At that time the <br />will reclaim the northern boundary in full. He may th <br />the major operation into Phase 3 and eventually Phase <br />ing on the quality of the material encountered or he m <br />release and amendment to his permit so that he can con <br />on the resources found along the west boundary. Shoul <br />case occur, the operator would merely be exchanging tw <br />of previously disturbed turf and should not be held re <br />for the existing disturbance in Phases 3 or 4 except <br />haul roads and the small stockpile area (about 4 acre) <br />east boundary of the site. <br />corner <br />'base lA <br />this <br />e 1B will <br />the site <br />al direct- <br />oil stock- <br />s material <br />ost entire- <br />1 cuyds of <br />ected from <br />it is add- <br />its loca- <br />as noted <br />south <br />y shifts <br />d grading <br />he desig- <br />ration. <br />activity <br />places. <br />tely 15 <br />land. <br />ope in <br />material. <br />pending <br />terial <br />luence <br />rtually <br />se of <br />natural <br />rom the <br />nd or <br />In time <br />perator <br />n shift <br />depend- <br />y seek <br />entrate <br />the last <br />pieces <br />ponsible <br />or any <br />on the <br />Mining will be done with a Caterpillar Model 930 front end <br />loader equipped with a 2? cuyd. bucket. Backfilling w 11 be <br />
The URL can be used to link to this page
Your browser does not support the video tag.